Projects

Category > Pipelines

Related Categories

Listings

There are 9 Listings in this Category.

Eastern Pipeline Inter-connector

The Eastern Pipeline Interconnector is a bulk water network that can transport water between Redland City and Logan City, as part of the South East Queensland Water Grid.

Overview

The Eastern Pipeline Interconnector is a bulk w ...

StatusOn hold

Gladstone – Fitzroy Pipeline

The Gladstone Area Water Board proposes to construct a water pipeline between the Fitzroy River to Gladstone Area Water Board’s existing water infrastructure at Yarwun.
Project elements include:

  • an underground pipeline appro ...

    StatusEIS active

Nathan Dam and Pipelines

The proposed dam is located on the Dawson River about 315 km adopted middle thread distance near Nathan Gorge in Banana Shire about 35 km north east of Taroom. The dam construction type has yet to be determined but will be either mass concrete or rol ...

StatusEIS active

Northern Pipeline Inter-connector - Stage 1

The Northern Pipeline Inter-connector (NPI) is a drought contingency project that will provide the capability to transfer 65 megalitres of water per day from the Sunshine Coast to areas of need in South East Queensland. The NPI will be developed in s ...

StatusEIS complete

Northern Pipeline Inter-connector - Stage 2

The Northern Pipeline Inter-connector (NPI) is a drought response measure set down in the Water Amendment Regulation (No.2) 2008 to supply up to 65 ML/day of potable water to the South East Queensland Water Grid by 31 December 2008.

Unde ...

StatusEIS active

Northern Pipeline Interconnector

The Northern Pipeline Interconnector will be about 100 kilometres long and will have the capacity to transport 65 megalitres per day between Sunshine Coast water supplies and the South East Queensland Water Grid.

In addition to supportin ...

Southern Regional Water Pipeline

The Southern Regional Water Pipeline is a two-way 94 kilometre pipeline that can move 130 megalitres per day between the Gold Coast, Logan and Brisbane, to where it’s most needed.

Overview

The $900 million project is designe ...

StatusEIS complete

Toowoomba Pipeline project

The construction of a pipeline from Wivenhoe Dam to secure the water supply for Toowoomba was proposed by the Toowoomba Water Supply Task Force and included in the draft South East Queensland Water Strategy.

The Toowoomba Pipeline projec ...

Water Pipe Procurement Centre

To ensure the South East Queensland Water Grid was delivered on time and at the right price, the Queensland Government secured pipes for the grid centrally through the Water Pipe Procurement Centre.

By procuring the pipes centrally the s ...