Projects

Sub Categories

Listings

Results 1 - 18 of 18

Narangba Hardrock Haulage

Community consultation for the Hardrock Haulage Strategy Study in the Narangba-Rush Creek-Whiteside area of the Pine Rivers and Caboolture Shires was conducted throughout 2002. As a result, the final report by Parsons Brinckerhoff Australia Pty Ltd w ...

Category:Hardrock

Nathan Dam and Pipelines

The proposed dam is located on the Dawson River about 315 km adopted middle thread distance near Nathan Gorge in Banana Shire about 35 km north east of Taroom. The dam construction type has yet to be determined but will be either mass concrete or rol ...

Category:Water
StatusEIS active

Nerang to Stewart Road, Broadbeach

The Queensland Government is committed to implementing the South East Queensland Infrastructure Plan. The Department of Infrastructure and Planning is responsible for the delivery of the South East Queensland Infrastructure Plan and Program projects. ...

Nerang-Broadbeach Road – Allambe Gardens to Nielsens Road – intersection upgrades

The Queensland Government is committed to implementing the South East Queensland Infrastructure Plan. The Department of Infrastructure and Planning is responsible for the delivery of the South East Queensland Infrastructure Plan and Program projects. ...

New Acland Coal Mine: Stage 3 Expansion

New Acland Coal Pty Ltd (NAC), the proponent, proposes to develop the New Acland Coal Mine Stage 3 Expansion project. The project involves the progressive expansion of the existing New Acland Coal Mine and associated infrastructure to increase coal p ...

Category:Coal
StatusEIS active

New Passenger Rail Stock (Gold Coast)

The Queensland Government is committed to implementing the South East Queensland Infrastructure Plan. The Department of Infrastructure and Planning is responsible for the delivery of the South East Queensland Infrastructure Plan and Program projects. ...

Category:Rail

New Passenger Rail Stock (Greater Brisbane)

The Queensland Government is committed to implementing the South East Queensland Infrastructure Plan. The Department of Infrastructure and Planning is responsible for the delivery of the South East Queensland Infrastructure Plan and Program projects. ...

Category:Rail

North Bank

Background and objectives

North Bank is a two kilometre stretch of  Brisbane’s CBD riverfront from the William Jolly Bridge to the Goodwill Bridge.

Commencing with the precinct between the Victoria Bridge and Alice Street ...

North Coast Rail – Beerburrum to Landsborough – track realignment and duplication

The Queensland Government is committed to implementing the South East Queensland Infrastructure Plan. The Department of Infrastructure and Planning is responsible for the delivery of the South East Queensland Infrastructure Plan and Program projects. ...

Category:Rail

North Queensland Gas Pipeline

Enertrade has constructed gas processing and compression facilities near Moranbah and approximately 400 kilometres of high pressure gas transmission pipeline running north to north west from Moranbah to Townsville. The pipeline will transport coal se ...

Category:Gas
StatusEIS complete

North-South Bypass Tunnel

This project is now called the Clem Jones Tunnel project.

StatusEIS complete

Northeast Business Park

Northeast Business Park Pty Ltd proposes to develop a major integrated business, residential, commercial and light industrial precinct including marina, golf course and conservation areas on a 762 hectare site on the southern bank of the Caboolture R ...

Category:Land
StatusEIS active

Northern Busway: Enoggera Creek to Aspley

The Queensland Government is committed to implementing the South East Queensland Infrastructure Plan. The Department of Infrastructure and Planning is responsible for the delivery of the South East Queensland Infrastructure Plan and Program projects. ...

Northern Link Road Tunnel

The Northern Link Road Tunnel project is predominantly an underground toll road proposed between the Western Freeway adjacent to the Brisbane Botanic Gardens at Toowong and the Inner City Bypass at Herston. The Brisbane City Council (BCC) is the prop ...

StatusEIS active

Northern Missing Link

Queensland Rail is proposing to construct and operate a 69 kilometre rail link between the North Goonyella and Newlands rail systems in the northern Bowen Basin coalfields. The rail link, commonly referred to as the Northern Missing Link, will connec ...

Category:Rail
StatusEIS complete

Northern Pipeline Inter-connector - Stage 1

The Northern Pipeline Inter-connector (NPI) is a drought contingency project that will provide the capability to transfer 65 megalitres of water per day from the Sunshine Coast to areas of need in South East Queensland. The NPI will be developed in s ...

Category:Water
StatusEIS complete

Northern Pipeline Inter-connector - Stage 2

The Northern Pipeline Inter-connector (NPI) is a drought emergency project resulting from the Water Amendment Regulation (No.6) 2006. Pending environmental assessment and approval, the NPI will supply up to 65 megalitres/day of potable (drinking) wat ...

Category:Water
StatusEIS active

Northern Pipeline Interconnector

The Northern Pipeline Interconnector will be about 100 kilometres long and will have the capacity to transport 65 megalitres per day between Sunshine Coast water supplies and the South East Queensland Water Grid.

In addition to supportin ...

Category:Water